Skip to main content
Workers assembling electronics on a production line

Home  /  Resources  /  Audit Checklist

Guide

China factory audit checklist: what to look at, and what the answers mean

A list of questions is the easy part. The value is in knowing which answers should change your decision.

Most factory audit checklists are long lists of yes-or-no questions. They are easy to fill in and tell you very little, because a factory that has been audited before knows the answer to every one. What separates a useful audit from a form is knowing what a good answer looks like — and checking it against something the factory did not prepare.

This is the checklist we work from, organised the way the visit runs. It is written for a buyer deciding whether to place a first order. If your customer requires a named social-compliance audit, that is a different exercise run by firms approved under the scheme, and nothing here replaces it.

Before the visit: ask for these in writing

  • The business licence, showing the registered Chinese name and the unified social credit code.
  • An equipment list with quantities.
  • An organisation chart with headcount by department.
  • The process flow for your product, marking any step done outside the building.
  • Every certificate the supplier has quoted, with its number.
  • The last three months' output for the line your product would run on.

The point of asking in advance is not the documents. It is that everything you are sent becomes a claim you can check on the day. A supplier who will not put a headcount in writing has told you something before you have booked a ticket.

On the floor: seven areas

AreaLook atA good answerShould stop you
Site and legalWhether the name on the gate, the licence and the invoice matchOne entity, one address, all three agreeA different company name on the gate or on the bank details
ProductionWhether the process for your product is physically presentEvery step in the flow chart is in the building, or the outside steps are namedFinished goods, but no machines that could have made them
CapacityMachines and shifts, counted by youYour order is a share of output the factory can state and you can roughly reproduceNobody can say what last month's output was
Incoming materialsWhether material is checked on arrival and stored so it can be tracedLabelled lots and an inspection record per deliveryMaterial accepted on the supplier's word
In-process controlWhether a work instruction and an approved sample are at the stationOperators can show you the standard they work toThe standard exists only in the office
Final inspectionWho releases goods, against what, and where rejects goA separate rejects area with something in itNo rejects at all — nobody makes zero defects
Measuring and testingWhether gauges and test equipment are calibrated and actually usedCalibration labels in date; operators can use the equipmentTest equipment under a dust cover

Three checks no form asks for

  • Follow one order end to end. Pick a recent order — not one the factory chooses — and ask for its purchase order, incoming inspection record, in-process record, final inspection report and packing list. A factory whose system is real can produce the chain in minutes. One that reconstructs records for visitors cannot do it for an order you picked.
  • Go to the rejects. What is in the rejects area tells you what the process actually gets wrong, which is exactly what the sales team will not.
  • Count something. Machines, operators on the line, cartons produced in the hour you are standing there. Then compare with the equipment list and the capacity you were sent. Small differences are normal. Large ones mean the paperwork describes a different factory.

Certificates: check the number, not the frame

A certificate on a wall proves that a frame was bought. Check each one against its issuer: the certificate number, the name of the certified company, the address, the scope and the expiry date. For ISO 9001 and other accredited management-system certificates, IAF CertSearch is a public database where a certificate can be looked up; testing and inspection companies run their own verification pages for the reports they issue.

The most common problem is not forgery. It is a genuine certificate that belongs to a different legal entity, or covers a scope that does not include your product.

Why a score is the wrong output

Many audit reports end in a percentage. It is a comfortable number and a poor basis for a decision, because it averages things that should not be averaged: a factory can score 85% with tidy paperwork and a line that cannot hold your tolerance.

Sort findings into three groups instead — those that stop the order, those that must be fixed before production, and those to watch — and make the decision on the first group alone.

What a passed audit does not cover

An audit tells you what a factory can do. It says nothing about what it will do with your order three months later. Production that drifts from the approved sample, a substituted material, a quietly subcontracted batch — none of these is visible on audit day. They are the job of inspection, and the two are bought for different reasons: see when to inspect a China order and, for how a pass or fail is actually decided, AQL sampling explained.

Doing it yourself, or sending someone

If you are in China anyway and the product is simple, this checklist and a day on site will tell you most of what you need. It gets harder when the records are in Chinese, when the process is one you have not seen before, or when the factory is a flight away from the last one. We run this as a standalone factory audit for $320, with a dated report, whether or not the order goes through us.

Before any visit, it is worth an hour confirming from records that the company is what it says. How to verify a Chinese supplier covers that step.

Frequently asked questions

What should a factory audit checklist include?
Seven areas: site and legal identity, production capability, capacity, incoming material control, in-process control, final inspection, and measuring and testing equipment. For each one the checklist should say what a good answer looks like, not just ask a yes-or-no question.
How long does a factory audit take?
A day on site is typical for a standard consumer-goods factory, with the report following shortly after. Larger or multi-site operations take longer.
Is an ISO 9001 certificate enough to skip an audit?
No. It certifies that a management system exists at the certified site. It does not say the factory can make your product to your tolerance, and the certificate may belong to a different legal entity or cover a different scope. Verify it with the issuer, then decide on the audit separately.
What is the difference between a factory audit and an inspection?
An audit looks at the factory before you place an order and tells you what it is capable of. An inspection looks at your goods during or after production and tells you whether this batch is acceptable. A factory can pass the first and fail the second.
Should the factory be told about the audit in advance?
Yes. An audit is announced and needs the factory's cooperation. The checks that matter are the ones that cannot be staged: records for dates you choose, an order you pick, and things you count yourself.

Related

Around the audit

Get a free quote

Want someone on the floor for you?

Send the supplier's details and what you plan to order. We come back within 24 hours with what an audit would cover and when it can be done.

Start your enquiry